Decision blocked
Core operation unavailable, material control failure, serious data risk, or no viable workaround.
Acceptance cycle
01PlansFrame scope, roles, entry conditions, and the acceptance calendar.02CasesTurn business intent into observable, decision-grade scenarios.03RunsConduct sessions with traceable outcomes and disciplined retests.Decision record
04DefectsCalibrate impact, ownership, evidence, and closure.05EvidenceAssemble the record behind every acceptance decision.06ReleasesConvert readiness into an explicit, accountable decision.Field desk
TToolkitCalculate release readiness. LLibraryBrowse the UAT inventory. DDemandsSet non-negotiable controls.Current discipline
Make the decision visible before the deadline makes it for you.
Enter the release room →04 · Defects
Describe impact, calibrate severity, preserve ownership, and make every unresolved exposure visible.
The minimum record
Who cannot do what, how often, and with what operational, financial, or control consequence.
The precise difference between the accepted outcome and the evidence from the run.
Candidate build, environment, role, data state, preconditions, and concise actions.
The smallest useful attachment set, redacted where necessary and tied to the run.
Fix, defer, workaround, accept, or withdraw—with owner and decision date.
Impact scale
Core operation unavailable, material control failure, serious data risk, or no viable workaround.
Major journey fails or produces unreliable results; workaround is costly, fragile, or narrow.
Business outcome remains achievable with a bounded, understood workaround.
Cosmetic, wording, or minor usability issue without material outcome or control impact.
Triage rhythm
The defect council should include business impact, delivery feasibility, operational exposure, and release authority. Its job is to produce treatment decisions—not just labels.
Confirm the observed gap and remove duplicates without erasing context.
Apply the agreed severity model to business consequence.
Choose fix, workaround, defer, accept, or remove from scope.
Name the accountable role and the next decision date.
Closure standard
A defect leaves the release record only when its treatment, verification, and remaining exposure are all explicit.